BABA and Buy American Act (BAA) compliant configurations are available for select LEOTEK roadway and traffic lighting products.
Countdown Signal Module
Hand & Person Overlap
Hand & Person Side by Side
External / Plug-and-Play Smart Node (Mounts externally to the fixture)
Integrable lighting products
Internal / Integrated Smart Node (Built directly inside the luminaire)
Integrable lighting products
The central AI management system (CMS) of the LEOlink Intelligent Lighting System.
Integrable lighting products
Frontier isn’t just a name—it’s a declaration. Born from the legacy of Dialight’s trusted traffic signal designs and reimagined by LEOTEK’s innovation-driven R&D and product management teams, Frontier stands as a symbol of reliability, evolution, and regional adaptation.
Compare LEOTEK IL6 Series traffic signal modules for bicycle and bus indications. Review model specifications and download supporting product documents.
Explore related applications: Traffic signal applications · All Traffic Signal products
Check our LEOLab pages to find more information.
If you need any service, please feel free to contact us!
PROJECT SUPPORT
Answers to common questions about product selection, installation and procurement.
They display dedicated symbols for different users. The bicycle sheet offers 8-inch and 12-inch red/yellow/green models; the bus sheet offers 12-inch red/yellow/green models. Both documents specify 80–135Vac, 60Hz. Choose the agency-approved symbol and size for the signal plan, rather than substituting a ball or treating the two symbol families as one indication.
Specifications & documents
IL6 8” and 12” Bicycle Signal Spec Sheet · IL6 12” Bus Signal Spec Sheet
Further reading
Traffic Signal Approval: ITE, ETL and DOT Lists
A dedicated symbol changes the information presented to road users. Even where a housing accommodates the diameter, the controller circuit, signal placement and approved indication plan must suit that symbol. The bicycle and bus sheets are separate optical/electrical documents. Use the exact symbol order code and its own drawing; a standard ball’s approval or housing diameter does not establish acceptance of a symbol conversion.
Specifications & documents
IL6 8” and 12” Bicycle Signal Spec Sheet · IL6 12” Bus Signal Spec Sheet
Further reading
Traffic Signal Approval: ITE, ETL and DOT Lists
The bicycle table lists red, yellow and green in both 8-inch and 12-inch formats, with a tinted lens only. The six models draw 5.6–7.0W depending on size/color. A clear-lens suffix available on another IL6-P3 family is not evidence of a clear bicycle option. Include the BK symbol code, size and color on each procurement/spare line.
Specifications & documents
IL6 8” and 12” Bicycle Signal Spec Sheet
The bus sheet identifies TSL-12R-IL6-BS-A1 at 5.6W, TSL-12Y-IL6-BS-A1 at 6.8W and TSL-12G-IL6-BS-A1 at 7.0W. These are 12-inch, 80–135Vac models, not a white-only transit bar or an 8-inch bus option. Use each energized color’s actual duration for energy estimates instead of applying one family-wide wattage.
Specifications & documents
IL6 12” Bus Signal Spec Sheet
The bicycle and bus documents available here specify 80–135Vac, 60Hz; they do not document a 10–28Vdc model. The DC variants published for IL6-P3 ball/standard-arrow families are separate products. A DC symbol requirement needs its own confirmed order code and specification, rather than extending another family’s electrical range to these models.
Specifications & documents
IL6 8” and 12” Bicycle Signal Spec Sheet · IL6 12” Bus Signal Spec Sheet
Further reading
Traffic Signal Approval: ITE, ETL and DOT Lists
Both sheets list response under 75ms and turn-off voltage above 35Vac, along with constant-current optical output. Check the actual cabinet’s energized and off-state indications, transitions and monitoring against the approved procedure. The module characteristics help that assessment but do not guarantee every load-switch or controller combination; retain the tested symbol, color and circuit configuration.
Specifications & documents
IL6 8” and 12” Bicycle Signal Spec Sheet · IL6 12” Bus Signal Spec Sheet
The sheets describe O-ring sealing, UV-stabilized lens construction, −40°C to +74°C operation and five-year limited warranty. Their 70% initial-intensity-at-100,000-hours statement describes light output, not a 100,000-hour complete-system warranty. Maintain housing seals and field wiring, and preserve the exact symbol model’s service documentation.
Specifications & documents
IL6 8” and 12” Bicycle Signal Spec Sheet · IL6 12” Bus Signal Spec Sheet
Further reading
Long-Life LED Traffic Signals: Replacement Cost and ROI
Specify bicycle versus bus, diameter, red/yellow/green, input supply and termination by location. Check symbol recognition from the intended user approach, actual mounting/viewing geometry and cabinet sequence in the pilot. Retain the exact BK/BS order codes and matching documents for rollout and spares. Acceptance for another signal series does not establish the same symbol, lens choice or electrical configuration.
Specifications & documents
IL6 8” and 12” Bicycle Signal Spec Sheet · IL6 12” Bus Signal Spec Sheet
Further reading
Traffic Signal Approval: ITE, ETL and DOT Lists
Select bicycle and bus indications around the approved traffic-control design and the exact signal-head configuration. Match the proposed IL6 module to the physical, electrical and operating requirements.
Compare the IL6 bicycle and bus modules according to the required indication. Confirm lens format, color, dimensions, voltage and ordering details from the exact model specification.
Check signal-head clearance, mounting, visor or other accessories, wiring and cabinet supply. Review compatibility with the project load switching and monitoring equipment.
Use the agency acceptance procedure to verify indication operation with the actual controller and cabinet. Document visibility, operating sequence and any required monitoring or special-condition tests.
Create a schedule of exact model numbers and required indications, electrical variants, quantities and spare units. Obtain current specifications, installation instructions, applicable approval documentation and written warranty terms. Record the installed configurations so maintenance teams can select the correct replacement.